Latimer Church Johns Road – Christchurch

Deep Screw Piling & Engineered Methodology — Christchurch

Location

Christchurch

Total Piles

89

Depth

20m

Pile Type

Screw Piles

Project Overview

Moore Construction delivered advanced screw piling works for the Latimer Church Development, providing a robust deep foundation solution to support the structure under challenging ground conditions.

The project incorporated 89 screw piles installed to depths of up to 20 metres, along with a specialised methodology for 19 of these piles needing to be concrete-encased cantilevered.

Engineering Methodology

  • Temporary casing installation and excavation
  • Precision screw pile installation to design depth
  • Tremie concrete placement for controlled infill
  • Reinforcing cage installation and final concrete placement

Construction Delivery

Screw piles were installed using specialised piling rigs, with real-time torque monitoring providing continuous feedback during installation to ensure compliance with design requirements.

Pile installation required on-site welding of extensions to achieve full depth, followed by trimming, capping, and preparation for integration with downstream structural works.

Risk Management & Sequencing

Project planning emphasised the importance of completing piling works ahead of main construction activities to reduce programme risk, site congestion, and safety hazards.

Plant & Equipment

  • Geax EK110 drilling rig
  • Heavy excavator support fleet
  • Concrete delivery and placement systems

    Project Gallery

Key Capabilities Demonstrated

  • Advanced screw piling and deep foundation systems
  • Complex construction methodology development
  • Concrete-encased cantilevered pile solutions
  • Real-time installation monitoring and QA processes
  • Efficient sequencing and risk mitigation strategies
  • Delivery using fully owned specialist plant fleet