Project Type: Piling

  • July 10, 2025
    The project involved the construction of 116 bored piles, with diameters of 900mm and 750mm, and varying depths ranging between…
  • July 10, 2025
    Moore Construction was engaged by the Marlborough Roads Recovery Team (MRRT) to undertake slip repair works at Port Underwood, focused…
  • July 9, 2025
    Moore Construction was engaged to deliver foundation and ground engineering works involving screw piling, sheet piling, and dewatering for a…
  • March 13, 2025
    https://vimeo.com/1065264617?share=copy The project involves the installation of complex piling, 750mm diameter concrete bored piles, which are embedded at a depth…
  • May 30, 2023
    A complex project involving off site pre-casting of a two part chamber designed to act as a reinforcement and stabilisation…
  • December 13, 2022
    Moore Construction was contracted to pile the existing Waimangaroa Bridge in Westport on the South Island’s West Coast. This consisted…
  • December 13, 2022
    A complex and challenging project, The Carlin Hotel in Queenstown consisted of 84 bored piles to form the retaining structure…
  • September 23, 2022
    Petone to Melling Walkway and Cycleway.  This project involved installing CFA concrete piles as night works within meters of vital…
  • September 21, 2022
    A Piling project for 3 bridges in the Hurunui District. A42 Cloudy range, A30 Lyndon #2 Bridge and A33 River…
  • September 21, 2022
    Man Street Hotel project consisted of construction of 441 Secant Bored Piles drilled through Lake Sediments and Glacial Till into…