CIVIL CONSTRUCTION
Cast in situ concrete retaining wall at 12 Mile on the West Coast. All concrete pours & form work were completed between the tides. This was a challenging project with a rewarding outcome. The wall was 20m long x 5m above ground with rock bolts anchoring into existing rock. Concrete was 50MPA, micro silica with black colouring added to blend in with surrounding coastline.
PROJECT DETAILS
Client: | - |
---|---|
Location: | 12 Mile, West Coast |